Skip to Content

Infrastructure & Water Treatment Projects

🏗️ High Systems Electromechanics LLC

Infrastructure, MEP & ELV Projects

From pumping stations and MBR water treatment to MEP, BMS, CCTV & ELV solutions — delivering engineering excellence across 20+ countries since 2000. The projects below are a curated selection — a tip of the iceberg of 1,000+ projects executed over 26 years.

1,000+
Projects Executed
26+
Years Since 2000
20+
Countries
💧
5M+ m³/day
Water Management
Capacity
🌿
30%+
Avg. Energy Cost
Reduction (Solar)
🔋
5M+ kWh
Renewable Energy
Generated
📷
500+
CCTV & ELV
Installations
💡 Showing a curated selection — a tip of the iceberg of 1,000+ projects executed since 2000.

Projects

35 projects

A
🏗️ Infrastructure
18 projects in this section
Wet Utilities (14 projects)
Wet Utilities
💧 Wet Utilities 📅 2026
🇦🇪 Dubai Maritime Island
📍 UAE

Flood Risk Mitigation — Supply & Installation of Storm Network Safety Units

Storm NetworkFlood ControlDubai Maritime
  • 1

    Proactive Flood Risk Protection

    Storm network safety units prevent damage to infrastructure and assets during heavy rain events.

  • 2

    Regulatory Compliance

    System meets Dubai Municipality stormwater standards and flood mitigation requirements.

  • 3

    Rapid 2-Month Delivery

    Fast-track project delivered within 2 months minimising flood risk exposure.

  • 4

    Resilient Infrastructure Design

    Safety units selected for long-term durability in the UAE coastal environment.

  • 5

    Integrated Network Coverage

    Comprehensive coverage of the Dubai Maritime Island storm network.

Wet Utilities
💧 Wet Utilities 📅 2026
🇦🇪 Dubai Maritime Island
📍 UAE

Piping & RC Works for Storm Network — Oil Interceptors & Mechanical Control Units

Storm NetworkOil InterceptorsRC Works
  • 1

    Pollution Prevention

    Oil interceptors prevent hydrocarbon contamination of stormwater discharge.

  • 2

    Mechanical Control Integration

    Automated units optimise storm network operation and flow management.

  • 3

    Structural RC Works

    Reinforced concrete installation ensures long-term durability.

  • 4

    5-Month Phased Delivery

    Well-managed programme minimised disruption to the active Maritime Island development.

  • 5

    Full Supply & Install Package

    Turnkey delivery covering supply, installation and commissioning.

Wet Utilities
💧 Wet Utilities 📅 2026
🇦🇪 DP World
📍 UAE

Full Revamping of 2 Stormwater Pumping Stations (1,730 CMD) — Dubai Maritime City

Pumping StationsStormwaterDP World
  • 1

    Full Station Modernisation

    Complete revamping restores full design capacity eliminating ageing infrastructure failures.

  • 2

    1,730 CMD Capacity Restored

    Upgraded stations handle 1,730 cubic metres per day.

  • 3

    Extended Asset Lifecycle

    New mechanical and electrical components extend operational life.

  • 4

    Improved Reliability & Uptime

    Modernised control systems deliver improved availability and faster fault response.

  • 5

    Minimised Operational Disruption

    Phased revamping minimised downtime during the 5-month programme.

Wet Utilities
💧 Wet Utilities 📅 2026
🇦🇪 Dubai World Central
📍 UAE

Supply & Installation of Sewage Bypass Lifting Station — Dubai World Central

Sewage BypassLifting StationDWC
  • 1

    Uninterrupted Sewage Management

    Bypass lifting station maintains continuous sewage flow during maintenance or emergencies.

  • 2

    Fast 2-Month Installation

    Rapid delivery minimises disruption to Dubai World Central operations.

  • 3

    Environmental Risk Prevention

    Reliable bypass capability prevents raw sewage overflows.

  • 4

    Scalable Design

    System handles peak flow and accommodates future capacity requirements.

  • 5

    Full Turnkey Delivery

    Package covers equipment supply, civil works, installation and commissioning.

Wet Utilities
💧 Wet Utilities 📅 2023
🇦🇪 Dubai Municipality
📍 UAE

Civil & MEP Refurbishment — Al Khawaneej & Zabeel Main Irrigation Stations

Irrigation StationsCivil WorksMEP Refurbishment
  • 1

    Structural Rehabilitation

    New roof slabs and concrete repairs restore full station integrity.

  • 2

    Extended Infrastructure Life

    Full civil and MEP refurbishment adds decades to the operational life.

  • 3

    Improved Waterproofing

    New roof slab design eliminates groundwater ingress.

  • 4

    Enhanced Water Management

    Refurbished stations improve flow control and operational efficiency.

  • 5

    Dubai Municipality Standards

    Works delivered to full Dubai Municipality engineering specifications.

Wet Utilities
💧 Wet Utilities 📅 2022
🇦🇪 Dubai Municipality
📍 UAE

13 Irrigation Station Tank Filling Enhancement — Rehabilitation Programme

IrrigationRehabilitation13 Stations
  • 1

    Network-Wide Rehabilitation

    Simultaneous rehabilitation of 13 irrigation stations improves network reliability.

  • 2

    Enhanced Irrigation Efficiency

    Upgraded tank filling systems reduce cycle times and water losses.

  • 3

    Optimised Water Distribution

    Improved flow control ensures equitable water distribution.

  • 4

    Reduced Water Losses

    Enhanced sealing, pipework and controls minimise water losses.

  • 5

    Long-Term Asset Value

    Rehabilitation programme protects Dubai Municipality's infrastructure investment.

Wet Utilities
💧 Wet Utilities 📅 2022
🇦🇪 Dubai Municipality
📍 UAE

New Hatta Irrigation Station — GRP Tank Relocation & Associated Civil Works

Irrigation StationGRP TankHatta
  • 1

    Complete Station Relocation

    Successful transfer of GRP tank and pump sets delivers a fully operational new station.

  • 2

    Improved Hatta Water Supply

    New location optimises water distribution for Hatta agricultural areas.

  • 3

    Rapid 21-Day Delivery

    Full relocation completed within 21 days, minimising service interruption.

  • 4

    Civil & Piping Coordination

    All civil works and pipework completed as an integrated package.

  • 5

    Asset Reuse & Cost Efficiency

    Relocating existing equipment delivers significant capital cost savings.

Wet Utilities
💧 Wet Utilities 📅 2022
🇦🇪 RTA / China State
📍 UAE

New Pumping Station — Nad Al Shiba (MEP Works)

Pumping StationMEPRTA
  • 1

    New MEP Infrastructure Delivery

    Complete MEP works delivered to RTA and China State specifications.

  • 2

    Multi-Discipline Coordination

    Electrical, mechanical and pipework delivered as a single integrated package.

  • 3

    Pump Capacity to Specification

    All pump sets installed, tested and commissioned to design requirements.

  • 4

    On-Time 6-Month Programme

    Project delivered within the contracted programme.

  • 5

    Quality MEP Execution

    Works completed to RTA engineering standards, passing all inspections.

Wet Utilities
💧 Wet Utilities 📅 2021
🇦🇪 Dubai Municipality
📍 UAE

Modification Works — Al Maktoum Road Irrigation Station

IrrigationModificationDubai Municipality
  • 1

    Station Performance Enhancement

    Targeted modifications improve flow capacity and system reliability.

  • 2

    Reduced Water Waste

    Upgraded distribution controls minimise water losses.

  • 3

    90-Day Efficient Delivery

    Compact programme completed within 90 days with minimal disruption.

  • 4

    Compliance with DM Standards

    All modifications designed to Dubai Municipality's specifications.

  • 5

    Asset Life Extension

    Modifications extend the operational life of the station.

Wet Utilities
💧 Wet Utilities 📅 2020
🇦🇪 Dubai Investment Park / Khatib & Alami
📍 UAE

Construction of Sewerage Lifting Station — DIP Expo Road

SewerageLifting StationDIP
  • 1

    New Lifting Station Infrastructure

    Full construction of a sewerage lifting station for the DIP Expo Road corridor.

  • 2

    120-Day Programme Delivery

    Project completed within 120 days, meeting the developer's handover timeline.

  • 3

    Expo Road Connectivity

    Station provides critical sewerage capacity for the Expo Road catchment.

  • 4

    Civil & MEP Integration

    Seamless coordination of all civil and MEP works under a single contract.

  • 5

    Regulatory Compliance

    Station designed to all applicable Dubai and UAE sewerage standards.

Wet Utilities
💧 Wet Utilities 📅 2019–2020
🇦🇪 Dubai World Central
📍 UAE

O&M of Dubai South Sewerage & Stormwater Stations — Contracts 135/136/2017

O&MStormwaterSewerageDWC
  • 1

    Comprehensive O&M Coverage

    2-year PPM programme covering 4 sewerage and 4 stormwater lifting stations.

  • 2

    Reduced Unplanned Downtime

    Structured schedules prevent equipment failures and maintain station availability.

  • 3

    Emergency Response Capability

    24/7 emergency response for any stormwater or sewerage network incidents.

  • 4

    Network Commissioning

    Testing and commissioning of potable, storm and sewerage networks.

  • 5

    Cost-Effective Long-Term O&M

    2-year contract delivers operational cost savings through planned maintenance.

Wet Utilities
💧 Wet Utilities 📅 2017–2019
🇦🇪 Dubai World Central
📍 UAE

Extension of Irrigation Network — EK FTO Building & Internal Network, Dubai South

Irrigation NetworkExtensionDubai South
  • 1

    Network Extension Delivery

    Full supply and installation connecting EK FTO building to the Dubai South main network.

  • 2

    Internal Network Integration

    Complete internal irrigation network installed and commissioned.

  • 3

    19-Month Programme Management

    Long-term programme managed effectively across 19 months.

  • 4

    Dubai World Central Compliance

    All works executed to DWC engineering standards.

  • 5

    Full Handover Documentation

    Complete as-built documentation and testing records provided.

Wet Utilities
💧 Wet Utilities 📅 2019
🇦🇪 Dubai World Central
📍 UAE

Underground Concrete Domestic Tanks (3 × ~50 m³) with Pump Packages — LC2, RC1, RC2

Underground TanksPumpsDWC
  • 1

    3 Underground Tank Installations

    Three 50 m³ reinforced concrete tanks at LC2, RC1 and RC2.

  • 2

    Integrated Pump & Pipeline Package

    Complete supply and installation of pump sets and pipelines for each tank.

  • 3

    Structural Quality Construction

    Tanks built ensuring long-term integrity and watertight performance.

  • 4

    Coordinated Multi-Site Delivery

    Three simultaneous installations managed within a single 6-month programme.

  • 5

    Full DWC Compliance

    Works designed, executed and documented to Dubai World Central quality standards.

Wet Utilities
💧 Wet Utilities 📅 2017–2020
🇦🇪 Dubai Municipality
📍 UAE

Operation & Maintenance — Al Salal Water Treatment Plant (Contract N/46/2017)

Water TreatmentO&MAl Salal
  • 1

    3-Year O&M Partnership

    Sustained 3-year operation and maintenance contract for Al Salal WTP.

  • 2

    Maintained Treatment Performance

    Ongoing plant operation maintains treated water quality within all DM standards.

  • 3

    Preventive Maintenance Programme

    Structured PPM schedules protect assets and extend equipment operational life.

  • 4

    24/7 Operational Availability

    Continuous operation with rapid response capability for any fault.

  • 5

    Cost-Effective Long-Term O&M

    3-year contract delivers operational efficiencies versus short-term arrangements.

MBR Water Treatment (2 projects)
MBR Water Treatment
🔵 MBR Water Treatment 📅 2022
🌍 USA Government / Dome Ints.
📍 Djibouti

Supply, Installation, T&C of 750 CMD MBR Containerized STP — Djibouti

MBR750 CMDContainerized STPInternational
  • 1

    750 CMD Containerized MBR System

    Full supply, installation, testing and commissioning of a 750 CMD containerized MBR STP.

  • 2

    International Project Delivery

    Successful execution for the US Government beyond UAE borders.

  • 3

    Modular Containerized Design

    Containerized MBR enables rapid deployment and minimal civil work.

  • 4

    US Government Standards Compliance

    System designed and commissioned to US government specifications.

  • 5

    8-Month Full Delivery

    Complete project delivered within 8 months in an overseas environment.

MBR Water Treatment
🔵 MBR Water Treatment 📅 2021
🇦🇪 Ministry of Health
📍 UAE

Supply & Install MBR Systems — Aldhaid, Kalba, Saqar & UAQ Hospitals

MBR4 HospitalsMinistry of Health
  • 1

    4-Hospital MBR Programme

    MBR water treatment units supplied and installed at four Ministry of Health hospitals.

  • 2

    Capacities: 60–300 m³/day

    Bespoke MBR units sized to each hospital: 60, 80, 100 and 300 m³/day.

  • 3

    Full Civil & MEP Refurbishment

    Complete refurbishment of civil and MEP facilities at all four hospital STP sites.

  • 4

    Hospital-Grade Treatment Quality

    MBR technology ensures treated effluent meets UAE Ministry of Environment standards.

  • 5

    Coordinated Multi-Site Delivery

    Four simultaneous installations managed within a 1-year Ministry of Health contract.

General Infrastructure (2 projects)
General Infrastructure
🏗️ General Infrastructure 📅 2024
🇦🇪 Islamic Affairs & Charitable Activities Dept.
📍 UAE

Supply & Installation of Car Parking Shades — Multiple Locations

Parking ShadesIslamic AffairsMultiple Sites
  • 1

    Multi-Location Coverage

    Parking shade structures supplied and installed across multiple locations.

  • 2

    UV & Heat Protection

    High-quality shade fabric significantly reduces surface temperatures.

  • 3

    Durable Steel Structure

    Galvanised steel frame construction designed for the UAE climate.

  • 4

    Rapid 2-Month Delivery

    All locations completed within a 2-month programme.

  • 5

    Custom Design per Site

    Shade structures adapted to each site's dimensions and aesthetic guidelines.

General Infrastructure
🏗️ General Infrastructure 📅 2019
🇦🇪 Dubai World Central
📍 UAE

Underground Utilities — GRP Irrigation Pipe Leakage Repair, Ø900mm, Peripheral Road Gate 6

GRP Pipe RepairUnderground UtilitiesDWC
  • 1

    Critical Leakage Resolution

    Rapid repair of a Ø900mm GRP irrigation pipe prevents water loss and subsidence risk.

  • 2

    Specialised GRP Repair Expertise

    Specialist GRP pipe repair techniques ensure a durable, watertight repair.

  • 3

    Minimal Infrastructure Disruption

    Repair executed with minimal excavation and disruption to the surrounding corridor.

  • 4

    Emergency Response Capability

    Fast mobilisation demonstrates HSE's ability to respond to urgent utility repairs.

  • 5

    Full Documentation & Handover

    Complete repair records and as-built information provided for asset management.

B
☀️ Solar Energy Solutions
2 projects in this section
On Grid (1 project)
On Grid
☀️ On Grid 📅 2025
🇦🇪 VIP Customer
📍 UAE

Supply, Installation, T&C of 60.72 kW Solar PV On-Grid System — Dubai

Solar On-Grid60.72 kWDubaiPV
  • 1

    60.72 kW On-Grid Capacity

    Full-scale solar PV system supplying renewable energy and reducing grid costs.

  • 2

    Grid-Connected Net Metering

    On-grid configuration enables export of surplus energy, maximising ROI.

  • 3

    Reduced Electricity Bills

    System offsets the majority of electricity consumption delivering immediate savings.

  • 4

    Fast 2-Month Delivery

    Complete supply, installation, testing and commissioning delivered within 2 months.

  • 5

    25+ Year System Lifespan

    Premium panels and inverters selected for long-term reliability.

Off Grid (1 project)
Off Grid
🔋 Off Grid 📅 2025
🇦🇪 Warsan Waste Management / Dubai Municipality
📍 UAE

Supply & Install Solar System with Full Cabling Infrastructure — Warsan

SolarOff-GridCablingDubai Municipality
  • 1

    Integrated Solar & Cabling Package

    Combined solar and cabling network connecting all facility buildings.

  • 2

    Renewable Energy for Waste Management

    Solar energy reduces operating costs and carbon footprint.

  • 3

    Full Cabling Infrastructure

    Complete LV cabling system designed, installed and tested.

  • 4

    Dubai Municipality Standards

    System designed and commissioned to Dubai Municipality specifications.

  • 5

    Turnkey 2-Month Delivery

    Complete package delivered and commissioned within 2 months.

C
⚡ MEP & ELV
15 projects in this section
Residential & Hospitality MEP (3 projects)
Residential & Hospitality MEP
🏨 Residential & Hospitality MEP 📅 2016
🇦🇪 Al Salhi Properties
📍 UAE

Full MEP Works — Voco Hotel, Palm Jumeirah (12 Stories)

Hotel MEPPalm JumeirahHVACFirefighting
  • 1

    Complete 12-Story Hotel MEP Package

    Full electrical, plumbing, HVAC and firefighting services for a Palm Jumeirah hotel.

  • 2

    Luxury Hospitality Standards

    All MEP systems installed to international hospitality standards.

  • 3

    Systems Integration

    Seamless integration of electrical, mechanical, plumbing and fire protection.

  • 4

    36-Month Programme Management

    Sustained delivery over 36 months coordinated across all project phases.

  • 5

    Full Handover & Documentation

    Complete as-built documentation, O&M manuals and commissioning records.

Residential & Hospitality MEP
🏨 Residential & Hospitality MEP 📅 2019
🇦🇪 Wasl Properties
📍 UAE

Full MEP Works — Wasl Village (3 Residential Buildings)

Residential MEPWaslHVACElectrical
  • 1

    3-Building MEP Programme

    Complete MEP works across three residential buildings under a single contract.

  • 2

    High-Quality Residential Systems

    Electrical, plumbing, HVAC and fire protection installed to Wasl Properties' standards.

  • 3

    Coordinated Multi-Building Delivery

    Simultaneous delivery across three buildings within a 48-month programme.

  • 4

    Resident-Focused Installation

    MEP works executed to minimise disruption for future residents.

  • 5

    Full Compliance & Handover

    All systems tested, commissioned and handed over with complete documentation.

Residential & Hospitality MEP
🏨 Residential & Hospitality MEP 📅 2018
🇦🇪 Salmon Farm
📍 UAE

Full MEP Works — Proposed Salmon Processing Factory

Factory MEPHVACFirefightingElectrical
  • 1

    Complete Industrial MEP Package

    Full electrical, plumbing, HVAC and firefighting for a salmon processing factory.

  • 2

    Industrial-Grade MEP Systems

    Robust MEP systems for the demanding requirements of a food processing facility.

  • 3

    Regulatory Compliance

    All MEP systems installed to UAE building codes and food processing standards.

  • 4

    12-Month Delivery Programme

    Complete MEP package delivered within 12 months.

  • 5

    Integrated Multi-Discipline Delivery

    Single-contractor MEP delivery eliminates coordination risk.

Building Management Systems (2 projects)
Building Management Systems
🖥️ Building Management Systems 📅 2024
🇦🇪 Sharjah Islamic Affairs Dept.
📍 UAE

Supply & Installation of Customised BMS Systems for 5 Mosques — Sharjah

BMS5 MosquesSharjah
  • 1

    5-Mosque BMS Programme

    Customised BMS designed and installed across five mosques in Sharjah.

  • 2

    Energy Monitoring & Optimisation

    BMS enables real-time monitoring of energy consumption.

  • 3

    Centralised Control Interface

    Single interface allows remote monitoring and control of all five buildings.

  • 4

    Custom Design per Mosque

    Each BMS configured to the specific layout of the individual mosque.

  • 5

    Improved Operational Efficiency

    Automated controls reduce manual intervention and improve facility management.

Building Management Systems
🖥️ Building Management Systems 📅 2026
🇦🇪 Sharjah Islamic Affairs Dept.
📍 UAE

Annual Maintenance Contract — BMS Systems for 3 Mosques

BMSAnnual Maintenance3 Mosques
  • 1

    12-Month BMS Maintenance Coverage

    Annual maintenance ensures continuous performance across three mosques.

  • 2

    Preventive Maintenance Schedules

    Structured PPM programme maximises system uptime and reliability.

  • 3

    Rapid Fault Response

    SLA-backed response times ensure any fault is rectified promptly.

  • 4

    System Performance Reporting

    Regular reports provide full visibility of system health.

  • 5

    Cost-Effective O&M Partnership

    Annual contract delivers cost certainty and operational continuity.

CCTV & ELV Solutions (10 projects)
CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2018
🇦🇪 Al Wasl
📍 UAE

CCTV & LV Solutions — G+6, 63 Buildings, Al Qusais Residential Development

CCTVLV SystemsResidential63 Buildings
  • 1

    Large-Scale Residential Security

    CCTV and LV systems deployed across 63 residential buildings providing comprehensive surveillance.

  • 2

    Centralised Monitoring

    Integrated VMS enables centralised monitoring and rapid incident response from a single control room.

  • 3

    Scalable Architecture

    System designed to accommodate future expansion as the development grows.

  • 4

    Deterrence & Safety

    Visible CCTV throughout common areas, car parks and entry points deters criminal activity.

  • 5

    Full LV Infrastructure

    Complete LV cabling infrastructure installed to support CCTV, access control and intercom.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2019
🇦🇪 A.C.I
📍 UAE

CCTV & LV Solutions — 3B+G+45 Floor High-Rise Tower

CCTVLV SystemsHigh-RiseTower
  • 1

    High-Rise Security Coverage

    Comprehensive CCTV and LV covering all 48 floors from basement to roof.

  • 2

    Vertical Integration

    CCTV, access control and intercom integrated across all floors with centralised management.

  • 3

    Lift & Common Area Monitoring

    Dedicated cameras in all lifts, lobbies and car parks ensure complete coverage.

  • 4

    Fire & Emergency Integration

    LV systems integrated with the building's fire alarm for coordinated emergency response.

  • 5

    Future-Proof IP Architecture

    IP-based infrastructure enables remote monitoring and smart building integration.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2019
🇦🇪 Asri FZ
📍 UAE

CCTV, LV Solutions & GRMS — Byblos Hotel, B+G+9+R

CCTVGRMSHotelLV Systems
  • 1

    Integrated Hotel Security & GRMS

    Combined CCTV, LV and Guest Room Management System for Byblos Hotel.

  • 2

    Enhanced Guest Experience

    GRMS enables guests to control room environment, lighting and services digitally.

  • 3

    Operational Efficiency

    Integrated systems allow hotel management to monitor energy and security from one platform.

  • 4

    Hospitality-Grade CCTV Coverage

    Cameras cover all public areas while fully respecting guest privacy.

  • 5

    Energy Management Integration

    GRMS-linked controls reduce energy consumption in unoccupied rooms.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2020
🇦🇪 Dubai Municipality
📍 UAE

CCTV & LV Solutions — G+2, 3 Buildings + 2 Service Blocks

CCTVLV SystemsGovernmentDubai Municipality
  • 1

    Government-Grade Security

    CCTV and LV systems installed to Dubai Municipality standards across five structures.

  • 2

    Multi-Building Coordination

    Integrated surveillance covering all five structures with a unified monitoring solution.

  • 3

    Regulatory Compliance

    All systems designed and commissioned to Dubai Municipality specifications.

  • 4

    Rapid Incident Response

    Connected CCTV network enables immediate identification and response to any incident.

  • 5

    Reliable LV Infrastructure

    Structured cabling installed to support all security, communication and data requirements.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2018
🇦🇪 MAK Group
📍 UAE

CCTV & LV Solutions — 120 Villas, Alfurjan

CCTVLV SystemsVillasAlfurjan
  • 1

    Villa Community Surveillance

    Comprehensive CCTV and LV covering all 120 villas and communal areas of Alfurjan.

  • 2

    Perimeter & Gate Security

    Cameras at all entry/exit gates and along the full perimeter provide 24/7 deterrence.

  • 3

    Individual Villa Coverage

    Each villa connected to LV infrastructure for intercom, access control and CCTV.

  • 4

    Centralised Community Management

    Single monitoring station allows security staff to view all cameras across the development.

  • 5

    Scalable Structured Cabling

    Future-proof LV cabling supports addition of smart home and broadband devices.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2019
🇦🇪 Invest Group Overseas
📍 UAE

CCTV & LV Solutions — 106 Villas, The Polo Townhouses

CCTVLV SystemsTownhousesPolo
  • 1

    Premium Townhouse Security

    CCTV and LV systems installed across 106 townhouses to premium residential specifications.

  • 2

    Integrated Community Security

    Unified surveillance covering all townhouses, roads, amenities and perimeter.

  • 3

    Resident Access Control

    LV-integrated access control at all gates and unit entry points.

  • 4

    High-Definition CCTV

    HD IP cameras at all strategic locations for both live monitoring and post-incident review.

  • 5

    Full Handover & Training

    Complete documentation and handover training for the community management team.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2020
🇦🇪 Invest Group Overseas
📍 UAE

CCTV & LV Solutions — 29 Buildings, G+6, The Polo Residence

CCTVLV SystemsResidential Complex29 Buildings
  • 1

    Multi-Building Residential Security

    Comprehensive CCTV and LV across 29 residential buildings.

  • 2

    Centralised Security Control

    Integrated VMS allows monitoring of all 29 buildings from a single control room.

  • 3

    Car Park & Common Area Safety

    Dedicated cameras in car parks, lobbies and common areas across the development.

  • 4

    Scalable IP Infrastructure

    IP-based architecture enables seamless expansion and smart community integration.

  • 5

    LV Backbone Installation

    Structured LV cabling backbone supports CCTV, access control and data services.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2019
🇦🇪 Sheikh Zayed Housing Program
📍 UAE

CCTV & LV Solutions — 44 Villas, Residential Compound

CCTVLV SystemsGovernment Housing44 Villas
  • 1

    Government Housing Security

    CCTV and LV systems ensuring a safe and secure environment for residents.

  • 2

    Complete Compound Coverage

    All 44 villas, communal areas, car parks and perimeter covered by integrated CCTV.

  • 3

    Resident Safety Focus

    System design prioritises the safety and privacy of residents.

  • 4

    Robust Outdoor Equipment

    IP66-rated cameras and weatherproof LV enclosures for reliable UAE outdoor performance.

  • 5

    Handover to Housing Authority

    Full documentation, testing records and O&M manuals provided to the Housing Program.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2018
🇦🇪 Moh'd Bin Rashid Housing Est.
📍 UAE

CCTV & LV Solutions — G+1, 6 Villas Compound

CCTVLV SystemsGovernment VillasMBR Housing
  • 1

    Boutique Compound Security

    Tailored CCTV and LV for a 6-villa compound with effective perimeter surveillance.

  • 2

    Entry & Gate Control

    LV-integrated video intercom and access control at all compound entry points.

  • 3

    Private Villa Coverage

    Cameras at each villa entrance and compound perimeter without intruding on privacy.

  • 4

    Fast-Track Delivery

    Compact scope enabled efficient delivery with minimal disruption to villa occupants.

  • 5

    Full MBR Housing Compliance

    All systems designed and commissioned to MBR Housing Establishment specifications.

CCTV & ELV Solutions
📷 CCTV & ELV Solutions 📅 2021
🇦🇪 RTA
📍 UAE

CCTV & LV Solutions — Powerless / Wireless CCTV System

CCTVWirelessPowerlessRTAInnovation
  • 1

    Innovative Powerless CCTV

    Solar-powered, wireless CCTV cameras eliminating the need for mains power and cabling.

  • 2

    Zero Civil Works Required

    Wireless architecture removes cable trenching, drastically reducing installation time and cost.

  • 3

    Rapid Deployment Capability

    Wireless units can be installed and operational within hours, enabling rapid response.

  • 4

    Remote Monitoring via LTE/4G

    Cameras transmit live video over cellular networks to the RTA control centre.

  • 5

    Sustainable & Scalable Solution

    Solar-powered design delivers carbon-neutral surveillance that can be easily relocated.

Building the Future: Sustainable Infrastructure & Water Treatment by Synigrate

At Synigrate, we are committed to delivering next-generation infrastructure and water treatment solutions that meet the complex demands of today’s urban and industrial landscapes. Our expertise spans a broad spectrum — from strategic road construction and smart urban planning to high-performance water treatment facilities designed to secure access to clean, safe water across all sectors.

We design and implement state-of-the-art water management systems, including purification, wastewater treatment, desalination, and water recycling — each one engineered to meet the unique challenges of every project we undertake. Whether for residential communities, commercial hubs, or heavy industry, our solutions are tailored for resilience, sustainability, and efficiency.

Our seasoned team oversees every phase — from feasibility studies and technical design to construction, installation, and ongoing support — ensuring seamless execution and long-term reliability. By harnessing cutting-edge technologies and adhering to global best practices, we help our clients create infrastructure that drives development, safeguards natural resources, and enhances quality of life.

Explore our portfolio of transformative infrastructure and water treatment projects and discover how Synigrate is shaping a smarter, more sustainable future.


Infrastructure & Water Treatment by Synigrate


Roads and MEP assets refurbishment

Client: Dubai South 2020


High Systems undertook a significant project focusing on the refurbishment of roads and MEP assets in Dubai World Central-Dubai South region. 

This project aimed to enhance the infrastructure, ensuring modernization, efficiency, and sustainability in alignment with the growing needs of the area.

Pumping stations

Client: Dubai south 2021


 High Systems proudly delivered a significant project to South Energy. 

The project is Design-Built 3 main pumping stations work as a heart of cooling systems in Dubai world central.

Advanced MBR water treatment plant

Client: Ministry of Health 2021

The project Evolves the supply, installation, and commissioning of an advanced Membrane Bioreactor (MBR) water treatment Plants of capacity of 60 CMD , 80 CMD and 300 CMD in two streams for three hospitals in Sharjah and Ras Al Khaimah.


450 CMD Lifting station

   ​​​Client: Dubai Municipality  2021


Constructing a Sewerage lifting station of capacity of 450 cubic meters per day (CMD) in Dubai Investment Park 2 (DIP-2) to be handed over to Dubai municipality in the near future.

Temporary irrigation station

Client: Dubai Municipality 2022

This project is to Supply, install and testing & commissioning of a 60,000 USG temporary irrigation station in Hatta within 20-days only. 

The challenge of this project is the time restriction given by our client which we proudly delivered a working station within the time frame.   


Operation and maintenance of AL Salal STP

   ​​​Client: Dubai Municipality 2018-2021


The operation and maintenance of Al Salal Sewage Treatment Plant (STP) for Dubai Municipality involves the ongoing management, supervision, preventive and reactive maintenance of the wastewater treatment facility to ensure its efficient and effective functioning.  

  View all Water Treatment Projects